Which documents should you keep for a solar inspection?
Keep the applicable permit, approved plans, revisions, appointment reference and issued inspection result. Follow the authority having jurisdiction’s checklist.
- Check that each document belongs to the same address and permit.
- Give the crew the applicable approved plan revision.
- Retain any correction notice with the final result.
This is a records checklist. Your qualified installer and local authority determine the technical inspection requirements.
Source: DOE: permitting and inspection
What happens if the inspector requires a correction?
Keep the notice and assign each required action. Follow the inspector’s directions for evidence or reinspection.
Save the issued follow-up result when it arrives. A repair photo can document the work; the authority’s result establishes its inspection decision.
Example handoff: The correction notice is attached. Please confirm who owns the repair and whether the authority requires reinspection.
Which inspection record belongs in the funding package?
Use the issued result when the milestone calls for a passed inspection. Match its project identity and outcome to the request.
A permit or inspection booking does not establish that the job passed. If the result has conditions, keep them visible and check what the program requires.
How are a permit, inspection and PTO different?
A permit authorizes work through the local process. The inspection result records the review of installed work. Utility permission to operate addresses operation under the utility’s process.
Save each decision separately. That lets the next reviewer see what has actually been authorized.
Source: DOE: permitting and inspection
What permit evidence does LightReach ask for?
LightReach’s Solar Energy Plan permit guide accepts documentation such as an issued permit card or portal record. Check the address, permit reference, scope and issue details.
The guide also provides an affidavit route when the jurisdiction does not issue a relevant document. Use that process with the program contact instead of inventing a substitute. A permit record still answers a different question from the issued inspection result.
Source: LightReach: permit documents and no-permit jurisdictions
USE THIS ON YOUR NEXT JOB
Check the permit and inspection result.
Read the result, not just the filename. Confirm the address and any outstanding corrections.
| Document | What to confirm | Do not confuse it with |
|---|---|---|
| Permit | Issuing authority, address, permit reference and applicable plans. | A passed inspection. |
| Inspection appointment | Scheduled date and the inspection being requested. | An issued inspection result. |
| Correction notice | The finding, responsible person and required follow-up. | Evidence that the correction was accepted. |
| Inspection result | Issued outcome, job identity and any remaining conditions. | Utility permission to operate or financier approval. |
R11 workflow guidance. Use the assigned project requirements to decide which records apply.
Read next: Funding milestones and evidence ↗